With the construction of Apadana refinery to purify the gas of Tang Bijar and Kaman Kooh gas fields located in Ilam province, the plan of Ilam Petrochemical Complex to use ethane products, C3 +, C5 of this refinery, after economic studies in the nine hundred and forty-seventh meeting of the company’s board of directors National Petrochemical Industries was approved on 4/18/2002 and subsequently approved by the Supreme Economic Council on 10/18/2002.

One of these projects, the implementation of which has caused a lot of criticism, is the Amirabad propylene project located in Mazandaran province. The project is to be built at a total cost of about $ 1 billion and has an annual production capacity of 470,000 tons of propylene.

Therefore, Ilam Petrochemical Company was established on 4/15/2003 and the construction of the complex began on a 122-hectare land in the Chavar section, 18 kilometers northwest of Ilam city.

Project information

Project information

Petrochemical of khuz
Project site

Khalij-e-fars
Preparation time

1404/05/01
Executive project

Oil and gas plant

دیدگاهتان را بنویسید

نشانی ایمیل شما منتشر نخواهد شد. بخش‌های موردنیاز علامت‌گذاری شده‌اند *

پروژه های مرتبط

آدرس دفتر : مشهد- بین دستغیب ۱۰ و سه راه فلسطین – گروه تبلیغاتی ایده

آدرس کارگاه : مشهد انتهای دلاوران – غزال ۱۲

تلفن همراه :  ۹۱۵ ۵ ۲۰۶ ۰۹۱۵

© کلیه حقوق سایت متعلق به گروه تبلیغاتی ایده می باشد.

طراحی سایت و سئو  کیان تک